Skip to content
Show submenu for About Us
Show submenu for Back to School Info
Show submenu for Calendar
Show submenu for Resources
Show submenu for Handbook
Show submenu for

2019 to Today - A Look at New Buildings

Road beside a modern building with large windows, reflecting sky. Grass on the left side.2026
The Middle/High School is two schools in one structure opened in August, 2026.One Building - Two Schools
Modern middle school building with flagpole, large windows, and a green lawn in front.2026
Opened for the 2026-27 school year for students in grades 7 and 8.WC Middle School
Entrance of a high school building. A large sign reads "HIGH SCHOOL" and number 5833. Two benches sit on the front.2024
Opened for the 2026-27 school year for students in grades 9 through 12.WC High School
Man standing on stage in front of a projector screen showing a bar graph.2019
The State paid 81% of the co-funded cost for new schools.Comparing Co-funded Costs
Workers in green shirts and hard hats stand atop a brick structure, with cranes and scaffolding in the background.2020
Construction began in the Fall of 2020.Two-Phase Construction Plan
Modern building with large windows and red door. Text reads "Early Childhood Center". American flag on a pole. Empty road in front.2022
One of two buildings opened for the 2022-23 school year.WC Early Childhood Center
A building with text, an American flag on a pole, and a road leading up to it.2022
One of two buildings opened for the 2022-23 school year.WC Intermediate School
Exterior of a two-story brick building with glass windows. A flag is visible on the building's left. An empty road leads to the front entrance.2025
The first Phase II building opened for the 2025-26 school year.WC Elementary School
A Building Bond Issue passed in Nov. 2019 for the construction of 5 new schools.